Resource Hub

Advanced Search

LATEST BROCHURES

  • AlphaV™ Single-Trip Casing-Exit System

    October 25, 2024
    Intervention and Abandonment

  • Casing Recovery Solutions

    August 22, 2024
    Intervention and Abandonment

  • ForeSite EDGE

    August 19, 2024
    Aging Reservoirs, Conventional, Production

LATEST TECHNICAL SPECIFICATIONS

  • Ultrahigh Temperature Dimension™ X-Y Caliper Tool

    November 14, 2024
    Formation Evaluation

  • Wireline Tool Standoff

    November 8, 2024
    Formation Evaluation

  • Relative Bearing Tool

    November 8, 2024
    Formation Evaluation

  • Oriented Perforating Tool

    November 8, 2024
    Formation Evaluation

LATEST HIGHLIGHTED CASE STUDIES

  • Reclaim™ Thru-Tubing P&A Solutions Prevents Gas Migration in 70-Year-Old Well, Protects Water Table, Avoids Surface Leakage

    United States

  • AlphaV™Single-Trip Casing-Exit System and AccuView® real-time remote support enabled Equinor to exit 13 3/8-in. casing in adverse wellbore conditions with enhanced efficiency and reliability

    Norway, North Sea

  • AlphaV™ Single-Trip Casing-Exit System Eliminates One Round Trip from Casing-Exit Sequence, Saving 30 Hours of Associated Rigtime

    Kuwait

  • AlphaV™ Single-Trip Casing-Exit System Eliminated Dedicated Wellbore-Preparation Run Increased Trip Speed 150%, Saving a Total of 20 Hours’ Rigtime

    Indonesia

LATEST REAL RESULTS

  • ForeSite® Edge Mitigates Oil Production Decline 3.7%, Reduces Failure 11%, Saves Approximately $344,000 Per Year for 10 Project Wells

    November 14, 2024
    United States

  • Reclaim™ Thru-Tubing P&A Solution Sets Cement Plugs Across Dual-Casing Annulus, Main Bore Using Coiled Tubing, Eliminates Section Milling Operations

    November 7, 2024
    United States

  • Magnus® Rotary-Steerable System Achieved Longest 12 1/4-in. Sidetrack Run of an Extended Reach Well in Field, Saved 26 Days of Drilling Time

    November 5, 2024
    United Kingdom

  • AlphaV™ Single-Trip Casing-Exit System and AccuView®real-time remote support enabled Equinor to exit 13 3/8-in. casing in adverse wellbore conditions with enhanced efficiency and reliability

    October 25, 2024
    Norway

LATEST PAPERS

  • Drilling and Well Construction in Lean Clearances in Northern Region of Pakistan

    December 19, 2023

  • Locating, Quantifying, and Remediating Downhole Sand Infiltration to Minimize Equipment Failures and Increase Oil Production: A Case Study in Kuwait

    October 9, 2023

  • Analysis of the Sources of Uncertainty in Geopressure Estimation While Drilling

    October 9, 2023

  • Successful Deepwater MPD Application in Drilling and Cementing Through Depleted Formation with Wellbore Instability and Loss Circulation Challenge Offshore of Sabah

    October 9, 2023

LATEST MULTIMEDIA

 
The Energy of Innovation
July 12, 2022
 
We Keep the Ball Rolling
July 10, 2020
 
Mature Field Solutions
April 30, 2020
 
Digitalization and Automation Solutions
April 30, 2020