Reducing Horizontal Well Construction Times

April 3, 2016
The construction time of a horizontal well at the Verkhnechonskoye oil and gas condensate field has been significantly reduced thanks to drilling a 178-mm production casing interval in a single run using the QuadCombo logging suite.