Real Results

All real results

Date Name
Dec 11
2024
Field-Proven ISO Ultra Extreme Bridge Plug Isolates HPHT North Sea Well Without Need for Cementing, Maintains Planned P&A Operations

Completions, Real Result, Weatherford World

Dec 04
2024
ForeSite® Edge Boosts Production, Reduces Failures 8%, Increases Incremental Revenue Approximately $670,000 Per Year

Production, Real Result, Weatherford World

Nov 22
2024
I-Wheel™ and Articulating Hole Finder™ Extend the Range of Wireline in Thailand

Formation Evaluation, Real Result, Weatherford World

Nov 22
2024
SMART Sens™ Delivers Plug Setting Assurance in Multi-Stage Completion Well

Formation Evaluation, Real Result

Nov 22
2024
I-Wheel™ Tandem Sub Saves 84 Hours Operating Time

Formation Evaluation, Real Result, Weatherford World

Nov 22
2024
Relative Bearing Tool Used to Determine Optimum Perforating Configuration

Formation Evaluation, Real Result, Weatherford World

Nov 22
2024
SPITFire™ Release Tool Performs with 100% Success Rate in Greaseless Wireline Campaign

Formation Evaluation, Real Result, Weatherford World

Nov 22
2024
SMART Sens™ Delivers Pump Down Assurance in Extended Reach Lateral

Formation Evaluation, Real Result

Nov 22
2024
Articulating Hole Finder™ Enables Logging in Challenging Southeast Asia Well

Formation Evaluation, Real Result, Weatherford World

Nov 14
2024
ForeSite® Edge Mitigates Oil Production Decline 3.7%, Reduces Failure 11%, Saves Approximately $344,000 Per Year for 10 Project Wells

Production, Real Result, Weatherford World