AlphaV™Single-Trip Casing-Exit System and AccuView® real-time remote support enabled Equinor to exit
Norway, North Sea
|
|
AlphaV™ Single-Trip Casing-Exit System Eliminates One Round Trip from Casing-Exit Sequence, Saving 3
Kuwait
|
|
AlphaV™ Single-Trip Casing-Exit System Eliminated Dedicated Wellbore-Preparation Run Increased Trip
Indonesia
|
|
ForeSite® Edge Mitigates Oil Production Decline 3.7%, Reduces Failure 11%, Saves Approximately $344,
Brazos Valley
|
|
Reclaim™ Thru-Tubing P&A Solutions Prevents Gas Migration in 70-Year-Old Well, Protects Water Table,
United States
|
|
Shallow Angle QuickCut™ Casing-Exit System Provides Single-Trip Casing Exit in Total-Loss Environmen
Saudi Arabia
|
|
Reclaim™ Thru-Tubing P&A Solution Sets Cement Plugs Across Dual-Casing Annulus, Main Bore Using Coil
United States
|
|
Magnus® RSS, RipTide® Drilling Reamer Drilled and Enlarged Well From 12-1/4 to 13-1/2 in. During Fir
Kuwait
|
|
Geochemical Spectroscopy Instrument Enabled Comprehensive Cased-Hole Formation Evaluation, Saved $10
Llanos Basin, Colombia
|
|
1D Geomechanics, Wellbore Stability Analysis Enabled Operator to Drill Salt Formation in One Run Aft
Pakistan
|
|